BOYDAK WASTE FIELDS

14 Hydroelectric Power Plants operated by Boydak Energy in Artvin, Ordu, Amasya, Van, Kastamonu, Bartin, Tokat, Giresun, Tunceli, Bayburt , 1 the Wind Power Plant, Temporary Waste Storage Area construction works have been carried out by us ,in accordance with the legislation, in order to store the wastes from the power plants. Within the scope of this work, design, production, installation and installation services were made by us.

Province : Artvin, Ordu, Amasya, Van, Kastamonu, Bartın, Tokat, Giresun, Tunceli, Bayburt, İstanbul

Year   : 2017